Protected Page
Enter the password to access the Apartment PC Sum tool.
Incorrect password.
Light protection only (prevents accidental access).
PC Sum Pricing Schedule — Apartment Blocks
Apartment items are per apartment. Common Areas items are per floor.
All prices exclude GST (+GST where applicable).
Project Inputs NZ / SGP
Company: —
Currency: —
GST rate: —
Apartment Works (per apartment)
$0.00
—
Common Works (per floor)
$0.00
—
Penetrations Total (EX GST)
$0.00
—
Preliminaries & General (P&G)
$0.00
Calculated so P&G = 10% of total price
PC Sum Total (EX GST)
$0.00
All prices exclude GST (+GST where applicable).
Terms & Conditions (prints in PDF)
Schedule logic Timber vs Concrete
The penetration list and rates switch automatically based on Construction type:
• Timber uses your Timber spreadsheet list (includes ceiling penetrations + top plate seals).
• Concrete uses your Concrete spreadsheet list (shorter apartment list as per your file).
You can still apply an optional “Adjustment factor” if needed for project conditions.
• Timber uses your Timber spreadsheet list (includes ceiling penetrations + top plate seals).
• Concrete uses your Concrete spreadsheet list (shorter apartment list as per your file).
You can still apply an optional “Adjustment factor” if needed for project conditions.
Penetration Schedule (Itemised) Includes Labels
| Label | Item | Area | Qty | Unit rate | Line total |
|---|