PC Sum Pricing Schedule — Hotels
Lift shafts are calculated per lift (per building). Stairwells and risers are calculated per floor.
All prices exclude GST (+GST where applicable).
Project Inputs NZ / SGP
These are allowance-based assumptions. Adjust the counts to suit your hotel layout.
Company: —
Currency: —
GST rate: —
Rooms (per room)
$0.00
—
Lift Shafts (per lift)
$0.00
—
Stairwells (per stair per floor)
$0.00
—
Risers (per riser per floor)
$0.00
—
Corridors (per corridor)
$0.00
—
Plant Rooms (per plant room)
$0.00
—
Back of House (total)
$0.00
—
Penetrations Total (EX GST)
$0.00
—
Preliminaries & General (P&G)
$0.00
Calculated so P&G = 10% of total price
PC Sum Total (EX GST)
$0.00
All prices exclude GST (+GST where applicable).
Terms & Conditions (prints in PDF)
How the allowances work Editable
Rooms: re-uses your apartment penetration schedule, then applies Room factor (hidden from PDF).
Lift shafts: per lift (building).
Stairwells: x5 electrical cables per floor per stairwell.
Risers: x10 cable collars and x5 metal pipes per floor per riser.
Corridors: x20 electrical cables per corridor.
Lift shafts: per lift (building).
Stairwells: x5 electrical cables per floor per stairwell.
Risers: x10 cable collars and x5 metal pipes per floor per riser.
Corridors: x20 electrical cables per corridor.
Penetration Schedule (Itemised) Includes Categories
| Category | Label | Item | Area | Qty | Unit rate | Line total |
|---|